the damage done to the library by the storm, last year on November. It was repaired in December |
I also need to add a layer of polystyreneon the outside walls to keep warm during winter and cold during summer. If I do not do all this, I am afraid that the next powerful storm will do more damage again, and this time it could be impossible to repair it.
After I talked with a team of workers I concluded that the
total ammount I need for the library is arround 500 euro.
This is how the library looks now after some repair. As you,
the roof needs urgent improvements. The walls must also be strenghtened |
If I am succesful in raising this ammount and I fulfil my plan
for the library, I also want to fix the Hondo (Dharma Hall) more
strongly on its cement platform with the same technology that will
be used on the library, and add polystyrene on its outside walls,
too. If I succeed this, then I will continue with the rest of the
plan for 2017.
If you can afford it, please consider a small DONATION,(click
here if you wish to donate) and help me strenghten the library.
Amidaji temple depends on your generosity.
I will post updates and photos if I make any progress with the library.
I will post updates and photos if I make any progress with the library.
inside the library |